Solar Power 23 - Top Solar Battery Electrical Contractor In Washington | (206) 557-4215

New Solar Rules Delayed Until 2016

Washington State is delaying the adoption of three stringent 2014 National Electrical Code® (NEC®) requirements for new Solar Photovoltaic (PV) systems until July 1, 2016. The three requirements are 690.11 Arc-Fault Circuit Protection (Direct Current), 690.12 Rapid...

Electric Vehicles (EV) and Solar

Cars and trucks consume a lot of energy. 29% of the Washington State’s total energy consumption, to be exact. The majority of this energy is from fossil fuels, the burning of which is causing increasing climate instability. Artisan’s raison d’être is help fight...